Abdelhamid, T S and Everett, J G (1999) Physiological Demands of Concrete Slab Placing and Finishing Work. Journal of Construction Engineering and Management, 125(01), 47–52.

Cottrell, W D (1999) Simplified Program Evaluation and Review Technique (PERT). Journal of Construction Engineering and Management, 125(01), 16–22.

Haidar, A, Naoum, S, Howes, R and Tah, J (1999) Genetic Algorithms Application and Testing for Equipment Selection. Journal of Construction Engineering and Management, 125(01), 32–38.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1999)125:1(32)
  • Abstract:
    This paper describes a research undertaken at South Bank University that investigated the feasibility of applying artificial intelligence methodologies to the optimization of excavating and haulage operations and the utilization of equipment in opencast mining. The selection of the excavating and haulage equipment to remove the overburden in opencast mining has a significant effect on the profitability of the operation. Thirty-five to fifty percent of the total cost of operating an opencast mine is attributed to excavation costs and 15–20% of the total cost is attributed to haulage costs. The decision to select equipment is often based on past experience, location, and different organizational pressures, as well as complex numerical computations. Therefore, the research was directed into the development of a decision support system XpertRule for the selection of opencast mine equipment (XSOME), which was designed using a hybrid knowledge-base system and genetic algorithms. The knowledge base within XSOME is a decision-making task utilizing a decision tree that represents several nested production rules. The knowledge base relates mainly to the selection of equipment in broad categories. XSOME also applies advanced genetic algorithms search techniques to find the input variables that can achieve the optimal cost. The system was tested on four case studies to validate its accuracy. For each case study the equipment selected by XSOME was analyzed and compared with the actual equipment used by the contractor in the mine. A sensitivity analysis was performed on each case study to provide potential suggestions in areas where improvements could be made.

Mulholland, B and Christian, J (1999) Risk Assessment in Construction Schedules. Journal of Construction Engineering and Management, 125(01), 8–15.

Schexnayder, C, Weber, S L and Brooks, B T (1999) Effect of Truck Payload Weight on Production. Journal of Construction Engineering and Management, 125(01), 1–7.

Shi, J J (1999) Mathematical Models for Maximizing Aggregate Plant Production. Journal of Construction Engineering and Management, 125(01), 53–60.

Son, J and Skibniewski, M J (1999) Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach. Journal of Construction Engineering and Management, 125(01), 23–31.

Thomas, H R, Riley, D R and Sanvido, V E (1999) Loss of Labor Productivity due to Delivery Methods and Weather. Journal of Construction Engineering and Management, 125(01), 39–46.

Zhu, B (1999) Effect of Cooling by Water Flowing in Nonmetal Pipes Embedded in Mass Concrete. Journal of Construction Engineering and Management, 125(01), 61–68.